PLTS 1000 MW
The Site survey and data collection will be carried out from 19 June to 21 June 2024 at the PV Power Plant (PLTS) location,
1/14/20251 min read
The Site survey and data collection will be carried out from 19 June to 21 June 2024 at the PV Power Plant (PLTS) location, GITET PLTU MT Sumsel 1, Tie-In Transmission Point, and GITET Betung for the development of this work.
This site survey and data collection aims to describe, among other things:
a. Site survey to assess existing conditions of connection point and to proposed site location.
b. Collecting existing equipment data in the control room and switchyard of the PV substation to plan compliance with the equipment plan at the PV substation
c. Observing the planned connection points for the MT Sumsel 1 - Betung 275 kV Substation PLTU line which will be connected to the first tower in the direction of the PV Substation